Work Breakdown Structure Project

Work Breakdown Structure Project

Project Unit 4: Work Breakdown Structure Project
Regarding the duration of my project, it is directed towards the all over project and the time set to finish the project. Whenever this project laid out and planned, it was set up in a way that every plan made was set up to be complete in a financial and timely way, first step by step by combining the different people that are involved. The individuals that are involved in the plan must come up with different ways of continuing the plan not sure of the completion of the overall plan and when it will be complete.

Assignment: Work Breakdown Structure Project
Create a high-level WBS comprised of at least three levels:

• Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks. • Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. • Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1. 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.

Submit a Word document. • There is no need to use APA formatting for this assignment

attachment

Do you have a similar assignment that you would wish our expert writers from Assignments Proficient to handle for you? Place an order with us on https://assignmentsproficient.com/ and expect the best grades and help from qualified writers

Assignments Proficient is a website where students from across the globe come under one roof to gain purposeful assignments. Globally, the education is still in its young stage where taking help by any means outside the educational institutes is infrequent. So we have separate forums to examine the variety of subject areas. Within each forum, there is ranking allotted to the person who is most efficient to do the assignment in the best possible way. If you are a student in Dubai or travelling here for your education, then we are the pillars of strength, whom you can trust and ladder of support, for any assistance in your assignment.

 
"Looking for a Similar Assignment? Order now and Get 10% Discount! Use Code "Newclient"